on 18 Sept 2024
Last Applicant/ Owned by
RHEEM MANUFACTURING COMPANY
500 Northpark Town Center1100 Abernathy Road, N.E.Suite 1700Atlanta, Georgia 30328
US
Serial Number
2005459 filed on 9th Jan 2020
Correspondent Address
STIKEMAN ELLIOTT LLP
Suite 701,99 Bank Street,Ottawa
ONTARIO
CA
K1P6B9
Trademark usage description
electric water heaters; furnaces, namely residential furnaces, industrial furnaces and furnaces for commercial buildings; heat pumps and air condition Read MoreVienna Information
27 . 5 . 1
Letters presenting a special form of writingLettres présentant un graphisme spécial
27 . 5 . 11
Letters underlined, overlined, framed or barred by one or more strokesLettres soulignées, surlignées, encadrées ou barrées d'un ou de plusieurs traits
26 . 4 . 26
Quadrilaterals with cutout areasQuadrilatères avec des zones découpées
26 . 11 . 2
Two lines or bandsDeux lignes ou bandes
26 . 11 . 13
Wavy lines or bands, zigzag lines or bandsLignes ou bandes ondulées, en dents de scie
26 . 4 . 2
RectanglesRectangles
26 . 4 . 6
Quadrilateral figures with one or more convex or concave sides -- Note: Not including elongated surfaces with one or more convex or concave sides (25.3.1).Figures quadrilatérales à un ou plusieurs côtés convexes ou concaves -- Note: Non compris les surfaces allongées avec un ou plusieurs côtés convexes ou concaves (25.3.1).
26 . 4 . 18
Quadrilaterals containing one or more lettersQuadrilatères contenant une ou plusieurs lettres
26 . 4 . 24
Quadrilaterals with dark surfaces or parts of surfacesQuadrilatères avec surface ou partie de la surface foncée
29 . 1 . 1
Red, pink, orangeRouge, rose, orangé
29 . 1 . 8
BlackNoir
11
2005459
Trademark
Action Taken | Status |
---|---|
Submitted for opposition 42 on 18th Sept 2024 | Advertised |
Submitted for opposition 26 on 21st Aug 2024 | Approved |
Submitted for opposition 27 on 21st Aug 2024 | Approval Notice Sent |
Submitted for opposition 22 on 3rd Jun 2024 | Search Recorded |
Submitted for opposition 20 on 3rd Jun 2024 | Examiner's First Report |
Submitted for opposition 287 on 7th Jun 2022 | Pre-Assessment Letter Sent |
Submitted for opposition 31 on 22nd Jan 2020 | Formalized |
Submitted for opposition 30 on 9th Jan 2020 | Filed |
Submitted for opposition 1 on 9th Jan 2020 | Created |