Last Applicant/ Owned by
SOLAR FLOW-THROUGH FUNDS
570 Granville StreetSuite 900V6C3P1P.O. Box V6C3P1Vancouver
BRITISH COLUMBIA
CA
V6C3P1
Serial Number
1902775 filed on 5th Jun 2018
Trademark usage description
photovoltaic installations for generating solar electricity generation of electricity from solar energy providing technological information for envi Read MoreVienna Information
1 . 3 . 1
Sun rising or settingSoleil levant ou couchant
1 . 3 . 15
Sun with rays constituted by rectilinear lines, sheaves of lines or bandsSoleil à rayons constitués par des traits, des faisceaux de traits ou des bandes rectilignes
26 . 4 . 3
Rhombs or squares standing on one of the corners thereofLosanges ou carrés sur pointe
26 . 4 . 5
One quadrilateralUn quadrilatère
26 . 4 . 13
Quadrilaterals containing representations of heavenly bodies or natural phenomenaQuadrilatères contenant la représentation de corps célestes ou de phénomènes naturels
26 . 3 . 1
One triangleUn triangle
26 . 3 . 6
Triangular figures with one or more convex or concave sidesFigures triangulaires à un ou plusieurs côtés convexes ou concaves
26 . 3 . 12
Triangles containing one or more other geometrical figures -- Note: Including triangles containing bent or straight lines.Triangles contenant une ou plusieurs autres figures géométriques -- Note: Y compris les triangles contenant des lignes courbées ou droites.
26 . 11 . 2
Two lines or bandsDeux lignes ou bandes
26 . 11 . 9
Oblique lines or bandsLignes ou bandes obliques
26 . 11 . 10
Straight lines or bandsLignes ou bandes droites
24 . 15 . 21
Arrowheads -- Note: Not including arrowheads in the form of angles (26.3.23).Pointes de flèches -- Note: Non compris les pointes de flèches en forme d'angles (26.3.23).
11
11
11
1902775
Trademark
Action Taken | Status |
---|---|
Submitted for opposition 70 on 9th Sept 2020 | Opposed |
Submitted for opposition 110 on 8th May 2020 | Proposed Opposition |
Submitted for opposition 42 on 11th Mar 2020 | Advertised |
Submitted for opposition 26 on 25th Feb 2020 | Approved |
Submitted for opposition 27 on 25th Feb 2020 | Approval Notice Sent |
Submitted for opposition 22 on 27th Nov 2019 | Search Recorded |
Submitted for opposition 20 on 27th Nov 2019 | Examiner's First Report |
Submitted for opposition 31 on 7th Jun 2018 | Formalized |
Submitted for opposition 1 on 6th Jun 2018 | Created |
Submitted for opposition 30 on 5th Jun 2018 | Filed |